Days until the 2030 Raw Materials Policy deadline:
00
Days
00
Hours
00
Minutes
00
Seconds

Circular renovation: Playground equipment in Haarlem gets a second life

Calculate the value of your old artificial grass pitch here!

The raw materials policy must be 50% circular by 2030 and even 100% circular by 2050. In order to make this happen, more and more municipalities are taking matters into their own hands. We gladly support municipalities in this by taking the lead in reducing artificial grass waste and setting a circular raw material flow in motion. By reusing these valuable raw materials, waste is prevented. Using the artificial grass waste calculator below*, you can make a good estimate of the possibilities of turning your old artificial grass pitch into recycled products.

Kunstgrasafval Calculator EN new

Recycle the present,
save the future

Everything is raw material: GreenMatter

Sustainability is gaining ground in our lives. Much that is old and worn out is being replaced by future-worthy solutions. Many synthetic turf pitches have been installed since the turn of the millennium, but too little attention has been paid to what should happen to the pitches at the end of their lifespan. Every year, old and worn artificial grass pitches are replaced and the arrival of recycling factories means that these are now processed into reusable raw materials.

The challenge is to give these discarded fields a new future and function. Because everything is raw material… and raw material is value! We link that raw material to innovative solutions that surpass traditional alternatives in terms of lifespan and quality. And the good news is: we don’t have to be limited in this process by applications for the sports world.

We are a joint venture between Lankhorst Engineered Products and W&H Sports and respond to the increasing demand for recycled products by bundling knowledge, expertise and investments in innovation. This collaboration opens up more possibilities. This includes solutions for ground, road and hydraulic engineering.

proces 1

Our solutions

GreenMatter ecoraster bloxx
GreenMatter

Ecoraster bloxx

GreenMatter ecoraster grastegel
GreenMatter

Ecoraster grass tiles

Grass tiles
GreenMatter

Ecoraster grass tiles XXL

Heer vrankenstraat.JPG
GreenMatter

Modular sports floor

Solar - Lights on.
GreenMatter

Solar

Dug-Out uitvoering 2 def
GreenMatter

Dug-out

greenmatter-walbeschoeiing
GreenMatter

River bank protection

greenmatter-damwand
GreenMatter

Combi pile planking

greenmatter-staander
GreenMatter

Pole

Informatieborden en bewegwijzering
GreenMatter

Information boards and signage

greenmatter-hockeybalken
GreenMatter

Hockey boards (indoor/outdoor)

greenmatter-gerecyclede-borstelmat
GreenMatter

Recycled brush mat

Voetenveger 1
GreenMatter

Foot sweeper

greenmatter-diamantkoppaal
GreenMatter

Bollard

Verge and barrier posts
GreenMatter

Reflector pole

greenmatter-picknicktafel-2-banks
GreenMatter

Picknicktable – 2 benches

greenmatter-picknicktafel-4-banks
GreenMatter

Picknicktable – 4 benches

GreenMatter 4 - zitsbank - losstaand_1
GreenMatter

Picnic table 4-seater bench unanchored

greenmatter-teamtafel
GreenMatter

Team table

GreenMatter rolstoelvriendelijke picknicktafel
GreenMatter

Wheelchair friendly picnic table

GreenMatter in practice

Circular renovation: Playground equipment in Haarlem gets a second life

First QR-FIT bench in the Municipality of Montfoort!
Innovative renovation of climbing wall in Diemen with recycled artificial grass.
How is it now ‘with the bridge that has been built’ from sustainable artificial turf?

Insights

Foto kunstgrasafvalberg
_GreenMatter SROI
Zero waste, alles is grondstof
Voetenveger 1
_Berm- en afzetpalen
Make impact. Step by step towards a greener and more inclusive future.
0

Number of
recycled synthetic turf pitches

0

Number of kilograms
recycled artificial
grass fibres

0

Number of hours
spend in SROI

Questions? We can be reached via +31 (0) 252 683 300 and [email protected]